Logistics & Lead Time

Transparent lead times, clearly defined. Prototypes same-day to 48 hours. Production runs confirmed at quoting. Singapore local delivery and self-collection. No hidden delays.

Same day

Prototype (1–5 pcs, pre-noon)

2–5 days

Small batches (6–50 pcs)
 

24h

Quote response time
 

Standard Lead Times by Quantity

Lead times run from drawing approval (not from initial enquiry). Material procurement adds 3–5 working days if material is not in stock. Your quote always includes a confirmed delivery date.

Order Type Typical Lead Time Conditions Applies To
Urgent Prototype — 1–5 pcs
Same day Order placed before 12:00 noon
Material in stock · standard service · standard drawing (no DFM issues) Metal cutting, glass cutting, PI film, engraving, non-metal cutting
Standard Prototype — 1–5 pcs
24 – 48h From drawing approval
Material in stock · new drawing requiring DFM review
All services including bending, welding, polishing
Small Batch — 6–50 pcs 2 – 5 days Working days from drawing approval Material in stock · FAI completed and approved All services
Medium Batch — 51–500 pcs
5 – 10 days Working days from drawing approval
Depends on complexity and current queue — confirmed on quote
All services
Large Production Run — 500+ pcs
Quoted per job Confirmed on quote
Scheduling and queue position confirmed before production start
All services
Material Sourcing (if required)
+3 – 5 days Added to production lead time
Applies to specialty materials not in stock — duplex SS, titanium, specialty glass, PI substrates
All services where material is not stocked
Combined Services (cut + bend + weld)
5 – 10 days From drawing approval
Sequential processing in-house — no inter-supplier handoff delay
Multi-step fabrication jobs

From Enquiry to Delivery

Six steps, typically completed in 24–48 hours for standard jobs. Each step has a defined timeline and owner.

Delivery Options

Three delivery modes for Singapore. Regional shipping to Malaysia and ASEAN available on request.

Common Questions

Logistics FAQ

Quick answers to the most common questions about ordering, delivery, and lead times.

Lead time starts from drawing approval — meaning the moment you confirm the quote and we have a reviewed, approved drawing with no outstanding DFM issues. If we raise DFM queries and you need to revise the drawing, lead time does not start until the revised drawing is confirmed. This is the industry-standard definition and ensures we are measuring actual production time, not waiting time.
If a complication is found during production that will affect the delivery date, we contact you the same day it is identified — not at the end of the scheduled lead time. We explain the issue, propose a revised date, and where possible offer an accelerated option. We do not silently extend lead times.
Yes — every quote includes a confirmed delivery date based on current production queue at time of quoting. If queue conditions change before you place the PO (e.g. if a week passes and queue has grown), we will reconfirm the date at PO acceptance. The delivery date on the quote is a genuine commitment, not an estimate.

Both options are available. We maintain stock of common grades (304 SS, 316 SS, 6061 Al, mild steel) in standard thicknesses up to 20 mm. For speciality alloys, we can source to your spec or you can supply your own material — just ship it to our facility with your order number.

Changes before production starts (no material cut yet) can usually be accommodated at no charge. Changes after production has started may require a revised quote if material has been consumed or tooling set up. If a change affects the delivery date, we will confirm the new date before proceeding. Always contact us as early as possible — the sooner we know, the more we can do.
Yes. For customers with monthly or quarterly repeat orders, we can establish a scheduled release arrangement — you release a batch at the start of each cycle and delivery is on a fixed date. This gives you predictable stock replenishment without placing individual orders each time. Contact us to discuss a framework agreement for recurring production.